Pinecones Intentional, Inc.   
 info@pinecones-intl.com   
 
Home  |  Profiles  |  About us  |  Contact us   
 
Home
 
Services/Scope
Project Flow
Experienced Projects
Translation Services
 
Profiles
About Us
Contact Us
 
Select language:
 
 
 
 
 
 
Current projects   Bank     Office/Building     Plant/Facility  
 
  Current Projects  
 
Design & Construction Projects
 
Construction Projects
 
 
  Maruichi American Corporation
http://www.macsfs.com
Project 1: Demo and new machine foundation renovation for the steel tubing production line

Building type: One-story steel building Construction area: 11,840 sq ft
Completed: March, 2008

A short-term project for the steel tubing manufacture. The operations continued without interruption while we reconstructed the foundations for the manufacturing plant.
 
Project 2: Steel tubing facility expansion and renovation
Building type: One-story steel building
Expansion area: 11,410 sq ft
Total floor area: 78,580 sq ft
Completed: December, 2008

Installed the exterior Insulation and Finish Systems (EIFS) which are multi-layered wall systems over the existing metal wall.
 
  Sakura Finetek USA, Inc.
http://www.sakura-americas.com
Project 1: 2nd floor interior improvement at Sakura manufacturing building
Building type: Two-story, reinforced concrete building
Construction area: 3920 sq ft
Completed: October, 2005

Renovated second floor offices, lab rooms, and factory assembly at a medical lab equipment manufacturing building.
 
Project 2: Histology Lab improvement at Sakura
main building
Building type: Two-story, reinforced concrete building
Construction area: 1,185 sq ft
Completed: September, 2009

Renovated and expanded existing laboratory rooms into the demonstration Sakura's equipment function.
 
  Uchida of America, Corp
http://www.marvy.com/
 
Project: New conference room, kitchen, and office renovation
Building type: One-story reinforced
concrete building
Construction area: 3,390 sq ft
Total floor space: 6,570 sq ft

Transformed an existing conference room into four manager rooms.

 
  Nichiren Church
http://la.nichirenshu.org/home/main.shtml
Project: New multi purpose hall and charnel house
Building type: One-story, wood frame building
Construction area: 2,910 sq ft
Completed: October, 2004

Used glue-lam beams without a post to create an unencumbered large hall.
     
     
 
  Gedatsu Church Los Angeles
http://gedatsu-usa.org/indexp.php
 
Project: New multi purpose hall and minister residence building
Building type: Two-story wood frame building
Construction area: 3,920 sq ft
Total floor space: 5,715 sq ft
Completed: March, 2007

A new wood framed building- a multi purpose hall on 1st floor and a minister residence on 2nd floor. To purpose to use as a Kendo training hall, installed reinforced rubber to construct the floating floor.
 
Orange Bakery, Inc.
http://www.rheon.com/en/index_e.htm
 
Project: Orange bakery 2 Toledo plant renovation

Building type: One-story, reinforced concrete building
Construction area: 10,170 sq ft
Total manufacture space: 21,100 sq ft
Completed: September, 2007

Removed an existing facility to install a new Toledo plant facility including pluming. In order to complete this project, manufacturing operation ceased for one month.
 
  Mitsuwa Corporation, San Diego Store
http://www.mitsuwa.com/tenpo/sand/index.html
Project: Market interior improvement Building type: One-story, reinforced concrete building
Construction sq ft: 19,380 sq ft
(Market space: 19,400 sq ft, Tenant space: 3,230 sq ft)
Completed: September, 2008

Renovated market floor, installed energy saving ceiling lights, tenant improvement
 
  T. Hasegawa USA Inc.
http://www.thasegawausa.com
 
Project: T. Hasegawa Cerritos plant renovation and expansion of powder production facilities
Building type: One-story, reinforced concrete building
Construction sq ft: 19,665 sq ft
Total building space: 38,750 sq ft
Completed: October, 2008

As a "turn-key project", it was planned, designed, and constructed for the plant renovation and expansion of powder production facilities including entire facility with upgrade process piping installation.
 
page_top  
 
Copyright 2004-2018 Pinecones Intentional, Inc., All Rights Reserved.